Sealed item rate
Quotation for the following work in prescribed form is invited only from the
IACS enlisted ‘Class-IV’ contractors in the category of ‘Electrical’ to
carry out the job at IACS, Jadavpur, Kolkata.
Name of Work : Electrical
renovation of Room No. 89 (DRU) at I.A.C.S., Jadavpur, Kolkata”.
Estimated Value : Rs. 26,489/-
(Rupees Twenty six thousand four hundred and eighty nine only)
Eligibility Criteria :
IACS enlisted ‘Class-IV’ contractor in the category of ‘Electrical’.
Completion of Work :
21 (twenty one) days from the date of issue
of work order.
Cost of Quotation Form :
Rs. 150/- per set (non refundable) to be paid in cash for issuance of Quotation
paper from office of the Electrical Engineering section.
However, the firms who will submit
their Quotation by downloading from our website ( ( (www.iacs.res.in)
should deposit Rs. 150.00 (one
hundred fifty only) in the form of
non-refundable e Demand Draft/Pay
order of a scheduled Bank positively
along with the Quotation in a
separate Envelope without which the
Quotation will be summarily rejected.
Quotation Issue Date : 07.01.2011 to
12.01.2011
(up to 3.00 P.M. on each working day)
Last date of application: 12.01.2010
(on letterhead by the firm mentioning NIT no. & Name of work on or before
this date up to 2.00 P.M).
Submission of Tender: on
or before 14.01.2011 (up to 2 PM).
Complete Quotation Form in a sealed envelop super scribing the name of the work,
NIT no. and due date of opening on the top of the envelop addressed to the
Registrar, IACS, Jadavpur, Kolkata 700032 to be submitted to our Receiving/despatch
Section.
Date of Opening
: 14.01.2011 (at 3.00 P.M in presence of intending bidders)
Acceptance of Quotation : IACS
authority does not bind itself to accept the lowest Quotation and reserves the
right to reject any or all the quotations
without assigning any reason.
The security deposit @ 10% of the bill value
shall be deducted from the bill of the contractor which will be released after
six months from the date of successful completion of work.
Deviation limit for individual item, trade and
contract as a whole is 25% (twenty five percent) plus. No claim
whatsoever will be entertained in this regard. However, IACS reserves the right
not to execute some items of work or to execute item/items partially as per
requirement.
If the contractor fails to maintain the required
rate of progress or to complete the work and clear the site on or before the
contract or extended date of completion, he shall without prejudice to any other
right or remedy available under the law, pay compensation the amount calculated
at the rates stipulated below or such smaller amount as IACS may decide (whose
decision in writing shall be final and binding) on the amount of the quotation
value of the work for every completed day / week (as applicable) that the
progress remains below or that the work remains incomplete.
i)
Completion period not exceeding 3 months (stipulated) @1% per week or
part thereof provided always that the total amount of compensation for delay to
be paid under this condition shall not exceed 5% of the value of the accepted
quotation of work.
The Engineer in Charge may without prejudice to his any other rights or remedy
against the contractor in respect of any delay, inferior workmanship, any claims
for damages and / or any other provisions of this contract or otherwise, and
whether the state of completion has or has not elapsed, by notice in writing
absolutely determine the contract in any of the following cases.
i.
if the contractor fails to rectify/replace the defects in spite of
written notice by Engineer –in-Charge
ii.
If the contractor suspends the progress of work so that in the opinion of
the Engineer-in-Charge he will be unable to secure completion of the work by the
date of completion and do not improve performance even after written notice.
iii.
If the contractor neglects to carry out his obligation under the contract
and / or commits defaults in complying with any of the terms and conditions and
does not remedy if even after written notice.
When the contractor has made him liable for action under any of the aforesaid
cases, the Engineer-in-Charge on behalf of IACS shall have powers
-
To determine or rescind the contract. Upon
such rescission, the full security deposit recoverable under the contract
shall be liable to be forfeited and shall be absolutely at the disposal of
IACS.
-
After giving notice to the contractor to
measure up the work done by him, get the balance work done by another
contractor. Any expenses which may be incurred in excess of the sum which
would work had been executed by him, shall be borne and paid by the original
contractor and may be deducted from any of his dues.
Complete Quotation
Document will also be available at
www.iacs.res.in and can be downloaded for submission. Conditional
Quotation including conditional rebates shall be summarily rejected. The
quoted rate shall be inclusive of all taxes & duties i/c service tax.
Nothing extra will be paid to the Contractor except to the accepted rate. In
case of any discrepancies, the office copy will be referred and shall be binding
to the contractor.
Registrar |